Palmdale Pool Remodeling & PebbleTec Specialists • CSLB #1068067

Full Pool Remodeling &
PebbleTec Resurfacing in Palmdale

Revitalize your aging 1980s, 1990s, or 2000s pool in Rancho Vista, West Palmdale, or East Palmdale. We perform full hydro-blast chip-outs, genuine PebbleTec finishes, Baja tanning shelf additions, tile & coping replacement, and concrete deck renovations.

Custom In-Ground Pool Builders in Palmdale (Remodeling) CA (93551, 93550, 93552)
✓
7–14 Day Plaster & Tile Turnaround
PebbleTec · Baja Shelves · Coping · 30-Day Startup
Plant 42 • Edwards AFB • Military & First Responder Program

Complimentary Custom Gas Fire Pit or Smart LED Pool Upgrade Up to $3,500 Value

In honor of the aerospace engineers, test pilots, service members, and first responders who power the Antelope Valley, AV Pool Pros (CSLB #1068067) includes a turnkey outdoor living or automation upgrade with every new in-ground pool build or full structural remodel.

Verified Eligibility:USAF Plant 42Edwards AFBLockheed Martin Skunk WorksNorthrop GrummanBoeingNASA ArmstrongActive Military & VeteransFire & Law Enforcement
Select Your Included Build Incentive
  • Option A — Custom Masonry Gas Fire Pit ($3,500 Value): Hard-piped natural gas line, 150,000 BTU wind-rated stainless burner, stone veneer & fire glass.
  • Option B — Smart Wi-Fi Automation + Color LED Package ($3,200 Value): Jandy iAquaLink / Pentair app control for pool, spa, heater & multi-color LED lighting.
  • Included Bonus — Military & Aerospace Pool Financing: Reduced-fee Lyon Financial pool & hardscape programs up to $200,000 with terms up to 30 years.
(661) 547-4114
Serving Palmdale (Remodeling) Neighborhoods (93551, 93550, 93552):Rancho Vista (93551)West PalmdaleAnaverdeDesert View HighlandsJoshua RanchEast Palmdale (93550 / 93552)
LOCAL PALMDALE (REMODELING) POOL ENGINEERING

Don’t Just Patch Old Palmdale Plaster—Modernize Your Entire Pool & Deck

Thousands of pools across Rancho Vista and Palmdale were built 20 to 35 years ago with standard white marcite plaster, 6x6 ceramic tile, brick coping, and unreinforced concrete decks that have now cracked, scaled, or delaminated.

We strip hollow plaster down to sound gunite, form and shoot structural Baja tanning ledges or raised spas, install frost-proof porcelain waterline tile and bullnose travertine coping, and perform the critical 30-day Orenda LSI startup so your new surface lasts 25+ years.

  • Full pneumatic chip-out & 4,000 PSI hydro-blasting with Multicoat structural bond-coat prep
  • Genuine PebbleTec, PebbleSheen, quartz aggregate & luminous glass-bead pool interiors
  • Custom structural additions: shallow Baja tanning shelves, umbrella sleeves, ledger-stone walls & spas
  • In-house concrete deck tear-out & replacement with diamond-cut pads, artificial turf ribbons & gas fire pits
  • 30-day Orenda LSI daily brush & chemical startup included—followed by priority 93551 weekly route service
One Contractor • Zero Subcontractor Delays

Turnkey Palmdale (Remodeling) Backyard Packages

We handle City of Palmdale building permits, excavation, steel, shotcrete, masonry, gas lines, concrete decking, retaining walls, and artificial turf—plus the 30-day Orenda LSI startup.

Custom Pools & Spas
4,500+ PSI Shotcrete
Concrete & Pavers
Rebar-Reinforced Decks
Retaining & Block Walls
Engineered CMU Walls
Fire Pits & BBQ Islands
High-BTU Wind-Rated
Artificial Turf
CoolFlo Pet & Pool Safe
Up to $200K Financing
Terms up to 30 Years
TAILORED TO PALMDALE (REMODELING) LOTS

Most Popular Pool & Hardscape Designs in Palmdale (Remodeling)

Most Popular 93551 Upgrade

PebbleTec + Waterline Tile + Travertine Coping Package

Complete plaster chip-out, new 6x6 or 1x2 glass waterline tile, bullnose travertine coping stones, VGB drain covers, color LED light retrofit, and 30-day chemical startup.

Structural Modernization

Baja Tanning Ledge & Shallow Entry Conversion

Convert an unused deep end or dated corner steps into a 7-foot-wide shallow sun shelf with LED bubbler fountains and built-in umbrella sleeves.

Complete Yard Transformation

Full Backyard Deck, Turf & Fire Pit Overhaul

Demo cracked 1990s concrete decking and replace it with geometric poured-in-place concrete pads, pet-safe artificial turf strips, and a custom masonry gas fire pit.

“Our 25-year-old pool in Rancho Vista looked rough and stained. AV Pool Pros added a Baja shelf, redid the tile and travertine coping, and applied PebbleSheen—it looks like a brand new resort.”

— G. & L. Walker, Rancho Vista (Palmdale, CA)

PROVEN HIGH-DESERT CRAFTSMANSHIP

Recent Pool & Backyard Transformations

BeforeAfter
Before
After
BeforeAfter
Before
After
BeforeAfter
Before
After

Palmdale (Remodeling) Pool Construction FAQs

How long does a pool remodel and PebbleTec resurfacing take in Palmdale?

A standard tile, coping, and PebbleTec resurfacing project in Palmdale takes 7 to 14 days from draining to refilling. Full structural remodels that include adding a Baja shelf, pouring a new concrete deck, and building a fire pit typically take 3 to 5 weeks.

Why is the 30-day chemical startup so important after resurfacing a pool in Palmdale?

Palmdale tap water has high calcium hardness and alkalinity fluctuations. If a freshly plastered pool is not brushed and balanced to the Orenda Langelier Saturation Index (LSI) during the first 28 days, calcium scale or plaster mottling will permanently scar the new finish. We handle the entire startup in-house.

Can we finance our Palmdale pool remodel and new concrete deck?

Yes! Through Lyon Financial, qualified Palmdale homeowners can finance 100% of their pool remodel, new equipment pad, concrete decking, and fire pit with low fixed monthly payments and terms up to 20–30 years.

Need Reliable Pool Service ?

Contact AV Pool Pro Service today for expert care, cleaning, and equipment repairs.

AV Pool Pro Service • CSLB #10680673958 Cocina Lane, Palmdale, CA 93551
Call Commercial Dispatch: (661) 547-4114
Or Request Fast Digital Quote

Full Pool Remodeling & PebbleTec Resurfacing in Palmdale — Verified Antelope Valley C-53 Engineering Specs

Direct Answer: AV Pool Pro Service (California C-53 Swimming Pool Contractor License CSLB #1068067, CA SOS #C6503137, D-U-N-S #135052395) delivers certified residential and commercial pool maintenance, equipment repair, PebbleTec resurfacing, and custom pool construction across Palmdale, Lancaster, Quartz Hill, and Santa Clarita. Call (661) 547-4114.

Pool Engineering & Service Standard AV Pool Pro (CSLB #1068067) Unlicensed “Chuck-in-a-Truck” Cleaners
State Contractor Licensing & Bonding CA CSLB #1068067 (C-53 Pool Contractor), CPO Certified, Fully Insured Unlicensed; illegal for repairs over $500 under CA B&P Code §7028
Water Chemistry & Hard Water Control LaMotte SpinTouch 10-Factor Digital Photometer & LSI Balancing Basic 2-way test strips; high calcium scaling & chlorine lock
OEM Equipment Warranty Protection Full 3-Year Pentair TradeGrade, Hayward & Jandy Factory Warranty Voided by manufacturer (60-day retail-only coverage)
Service Verification & Accountability GPS-Timestamped Digital Photo & Chemical Log Sent Every Visit Paper gate slips or unverified 5-minute splash-and-dash stops
Call